Air Conditioning
  • Hot/cold with automatic temperature control and ventilation
  • Climate control unit in each floor and a network of 4 hot / cold water pipes in façade
Water Quality
  • The whole building water is treated permanently with water softener
  • Special attention is given to the cooling towers for the prevention of Legionellosis
Electricity
  • Centralised meters on each floor
  • Own processing centre
Elevators
  • Technology “Destination Control” system MICONIC 10 – Maximum Energy Efficiency
  • Battery of 6 cabins with a capacity of 16 persons each
  • Unique lift elevator with direct access to the car parking
Disabled people
  • Stair lift platform-main entrance
  • Delayed locking doors and voice synthesizer in lifts
  • Single mode and multi mode optical fibre, cable flex 5 and telephone pairs for RTB, ADSL and RDSI systems
  • R.I.T.I. located in basement of the building
  • 2G communications system (GSM / DCS / GPRS) and 3G (UMTS)
  • Internal phone network
  • TDT connection throughout the building
  • Each floor is equipped with both male and female toilets
  • Male WCs has eight sanitary ware
  • Female WCs have three sanitary ware plus a bidet
  • Both are provided with marble vanity tops and high quality white sanitary ware